Operational Plan For The Numbers Using Fast Mass Transport Trem In Surabaya

  • Sapto Budi Wasono Universitas Narotama
  • M Zusron Anggik Universitas Narotama
Keywords: Operational Plan, The Numbers, Fast Mass Transport Trem

Abstract

Traffic jams often occur in the city of Surabaya. Due to the increasing population and the desire to have private vehicles, this has led to the need for adequate additional road capacity. However, the frequent increase in road capacity is not enough with the very high growth of road users. Therefore, the Surabaya city government planned an alternative route to reduce the congestion that occurred, one of which was building a rapid mass transportation, the tram, the construction of the tram itself was still in the planning stage, requiring a study of the influence of operational plans on public interest in trams, specifically for motorcyclists. What factors can make motorbike riders divert to the tram. One way to find out how much interest motorbike riders have is to use multiple linear regression methods which require data from road users. Questionnaires are needed to retrieve data and collect samples consisting of 200 respondents. In this study the location of the deployment is in the area that trams are going to plan for, starting from Joyoboo - Jl.Raya Darmo - Urip Sumoharjo - Jl.Basuki Rahmat - Jl.Embong Malang - Jl.Blauran - Jl.Bubutan - Tugu Pahlawan - Jl. Indrapura - Jl. Rajawali. While going south will pass Jl. Heroes - Jl. Gemblongan - Jl, Tunjungan - Jl. Governor Suryo - Jl. Panglima Sudirman - Jl. Urip Sumoharjo - Jl. Raya Darmo - Terminal Joyoboyo

Downloads

Download data is not yet available.

References

Department of Land Transportation, 2003. Decree of the Director General of Land Transportation number SK.687 / AJ.206 / DRJD / 2002 concerning Technical Guidelines for Implementing Public Passenger Transportation in Urban Areas in Regular and Regular Routes, Directorate General of Land Transportation, Jakarta.

Minister of Transportation, Decree of the Minister of Transportation Number KM.35 of 2003 concerning Implementation of Road Transportation on Public Vehicles.

Abubakar.dkk, 1995, City Transportation System, Jakarta, Director General of Land Transportation.

Chowdhury, S., Avishai (Avi) Ceder (2013), Definition of Planned and Unplanned Transfer of Public Transport Services and User Decisions to Use Routers with Transfers, Journal of Public Transportation, Vol. 16, No. 2, pp. 1-20

Ministry of Transportation, 1996, Directorate General of Land Transportation, "Technical Guidelines for Engineering Passenger Vehicle Termination" at the Ministry of Transportation, Jakarta.

Department of Transportation of Bandung City (2014), Feasibility Study of Bandung Monorail Corridor 1 and 2, Bandung: Department of Transportation

Dunphy, Robert T.et.al. (2004), Developing Around Transit: Strategies and Solution That Work. Washington: Urban Land Institute

Garnham, H. 1985. Maintaining The Spirit of Place. PDA Publisher Corporation, Arizona.

Ghozali, Imam. (2001). Multivariate Application with SPSS Program Edition 3. Semarang: UNDIP

Grava, Sigurd. (2003), Urban Transportation Systems. New York: McGraw-Hill Book Company

J. Supranto. (2009). Theory Statistics and Seventh Edition Applications. Jakarta: Erlangga

kompasiana.com (2015), Surotram and Boyorail: Impacts and Excesses, Publications: June 24, 2015

Liu, R., Pendyala, R.M. and Polzin, S. (1997), Assessment of Intermodal Transfer Penalities Using Stated Preference Data, Transportation Research Records 1607, pp. 74-80

P.B., Triton (2006), Applied SPSS 13.0. Reset parametric statistics, Yogyakarta: Andi publisher

Government Regulation of the Republic of Indonesia No. 74 of 2014 concerning Road Transportation

Sugiyono 2001, Administrative Research Methods, Alfabeta Publisher Bandung

Tamin, Ofyar Z. (2000), Transportation Planning and Modeling, 2nd Mold, ITB Publisher, Bandung

Law of the Republic of Indonesia No. 22 of 2009 concerning Road Traffic and Transportation

Warpani, S. (1990), Planning Transportation Systems, Bandung: ITB Publishers.

Wordpress.com (2014), Transportasi-massa-Cepat-surotram-dan-boyorail-di-surabaya, Publication 20 March 2014

Zahnd, Markus, (1999), Integrated City Design, City Design Theory and Its Application, Semarang: Kanisius Publishers

Masliyah. (2019). Potensi Jumlah Penumpang Pada Rute Purabaya–Bangkalan Dengan Menggunakan Moda Bis Kota. Jurnal Ilmiah Teknik Sipil KERN 1 (1): 1-10

Published
2020-09-30
How to Cite
Wasono, S., & Anggik, M. (2020). Operational Plan For The Numbers Using Fast Mass Transport Trem In Surabaya. IJTI International Journal of Transportation and Infrastructure EISSN 2597-4769 PISSN 2597-4734, 4(1), 63 - 83. https://doi.org/10.29138/ijti.v4i1.1166