Amaral, E. (2020). Case Study of Delay Construction Projects in Bidau Dili Timor-Leste Bridge. IJTI International Journal of Transportation and Infrastructure EISSN 2597-4769 PISSN 2597-4734, 3(1), 20-28. https://doi.org/10.29138/ijti.v3i1.1052