PuspitaN. and LutfiansyahY. (2020) “Cost and Time Performance Analysis with Concept of Earned Value (Case Study Jakarta - Cikampek II Elevated Project)”, IJIEEB International Journal of Integrated Education, Engineering and Business eISSN 2615-1596 pISSN 2615-2312, 3(2), pp. 64 - 70. vailable at: https://jurnal.narotama.ac.id/index.php/ijieeb/article/view/1167 (ccessed: 5December2024).