[1]
SalimA. 2018. ANALYSIS BEHIND THE SLOPE STABILITY IN THE LIMESTONE QUARRY BLOK MLIWANG TIMUR PT. SEMEN INDONESIA (PERSERO) TBK. TUBAN, JAWA TIMUR. IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734. 2, 1 (Sep. 2018), 26-38. DOI:https://doi.org/10.29138/ijti.v2i1.781.