[1]
MaulanaA. and KurniawanF. 2019. TIME OPTIMIZATION USING CPM, PERT AND PDM METHODS IN THE SOCIAL AND DEPARTMENT OF KELAUTAN BUILDING DEVELOPMENT PROJECT GRESIK DISTRICT. IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734. 2, 2 (Mar. 2019), 57-66. DOI:https://doi.org/10.29138/ijti.v2i2.784.