[1]
NugrohoB. 2019. RISK MANAGEMENT IN CONSTRUCTION OF DRY BULK JETTY AT TELUK LAMONG MULTIPURPOSE TERMINAL. IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734. 2, 2 (Mar. 2019), 67-76. DOI:https://doi.org/10.29138/ijti.v2i2.785.