30GT Fishing Vessel Electrical System Design
Abstract
The ship electrification process is the process of installing or providing electric power to supply all the electrical power needs for ships. In general, main electricity supply will be provided, and emergency supplies in the form of batteries or emergency generators that are able to survive supplying emergency loads such as navigation equipment, navigation lights, and emergency lighting for about 3 hours. Another consideration in the electrification process on fishing vessels is also aimed at reducing dependence or even replacing conventional fuel. Of course, not all machines or equipment that are usually operated with conventional fuel can be directly replaced with electrical energy. The implementation of electrification on fishing boats takes into account the technological and cultural aspects of fishermen so that not all of them will be directly replaced by electrical energy.
Downloads
References
M. Isradi Z, Patunru Pongki. (2021). Feasibility Analysis of Electrical Installation in Building PT. HONDA SEMOGA JAYA PRIMA :IDENTIFIKASI. Vol.7 no.1 pp (6–10)
John Cadix, Mary Capelli. (2018). Electrical Safety Handbook.. New York: Mc Grawhill.
BKI. (2019). Rules For Electrical Installations. Jakarta: BKI
Copyright (c) 2022 THE SPIRIT OF SOCIETY JOURNAL : International Journal of Society Development and Engagement
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.