Analysis of Time and Cost Efficiency through the Application of Design Review on the Bridge Rehabilitation Project in Bantuas Village, Samarinda City

  • Amir Mudrajad Universitas 17 Agustus 1945 Surabaya
  • Risma Marleno Universitas 17 Agustus 1945 Surabaya
  • Jaka Purnama Universitas 17 Agustus 1945 Surabaya
Keywords: Review design, time efficiency, cost efficiency, bridge rehabilitation, construction methods

Abstract

The application of review design in construction projects serves as an effective strategy to enhance implementation efficiency. This study aims to analyze time and cost efficiency resulting from the application of review design in the Bantuas Bridge rehabilitation project in Samarinda City. The research employs a comparative analysis between the initial design and the revised design, evaluating construction methods, equipment productivity, activity duration, and cost requirements. Data were collected from planning documents, cost estimates, technical reports, and field observations. The results indicate that the review design reduced project duration from 150 to 140 days, achieving a time efficiency of 6.67%. Additionally, the total project cost decreased from Rp3,000,487,000 to Rp2,860,487,000, resulting in a cost saving of 4.67%. These efficiencies were achieved through the adoption of precast minipile foundations and modular structural components such as steel decks. Therefore, the review design is proven to be an effective strategy for improving construction efficiency in terms of time and cost.

Downloads

Download data is not yet available.
Published
2026-04-24
Section
Articles