Optimization of Implementation of Crane Certification in Contruction Service Companies

Main Article Content

M Yusuf Arnol
Nyoman Gede Suryadharma
Manggi Dwi Cahyono
Dahrijoso Soejakti
Lalak Indiyono

Abstract

Purpose: This study aims to analyze the effect of accelerating the implementation of work and the costs needed for the job of occupational safety and health certification in the Construction services company in East Java province.


Design/methodology/approach: This study used a survey method carried out on 20 crane units in 4 construction service companies by analyzing data using Critical Path Method (CPM), resulting in an acceleration of inspection and testing of crane up to 37% with cost efficiency of  36 %.


Findings: The results of this study are expected to provide an overview of Crane's reliability as early as possible to users to anticipate operational failures through regular maintenance and repairs.


Research limitations/implications: This study can also determine the timing of inspection and testing in the context of implementing the Crane Occupational Safety and Health certification so that the use of resources can be optimized.


Practical implications: With the implementation of inspection and testing, certification can be fulfilled before the certification period ends.


Originality/value: This paper is original


Paper type: Research paper

Downloads

Download data is not yet available.

Article Details

Section
Articles
Author Biographies

M Yusuf Arnol, Universitas 45 Surabaya

Machine Engineering

Nyoman Gede Suryadharma, Universitas 45 Surabaya

Mechanical Engineering

Manggi Dwi Cahyono, Universitas 45 Surabaya

Mechanical Engineering

Dahrijoso Soejakti, Universitas 45 Surabaya

Mechanical Engineering

References

[1] ANSI/PMII 99-001. Project Management Body Of Knowledge (PMBOK GUIDE), 4 rd ed. Pennsylvania, Project Management Institute, 2008.
[2] ASME B30.5. Mobile and Locomotive Cranes, New York, The American Society Of Mechanical Engineers, 2014
[3] ASME B30.3. Tower Cranes, New York, The American Society of Mechanical Engineers, 2016.
[4] Damanpour, F. Organizational Innovation: A meta- analysis of Effects of Determinants and Moderators, Academy of Management Journal, 34(3), 1991, 555-590.
[5] Gray, F.C., Larson, W.E. Manajemen Proyek Proses Manajerial, Yogyakarta, Andy, 2006
[6] Kerzner, R.H. Project Management, 8 rd ed. Edition, New Jersey, John Wiley & Sons, 2013`
[7] Kuenh. U., Integrated Cost and Schedule Control in Project Management, Leesburg Pike, Management Concepts, 2011
[8] Mansur, Manajemen Pembiayaan Proyek, Yogyakarta, Laksbang Pressindo, 2012
[9] Tokar M., Arzensek, B. Failure of Crane Wire Rope, Engineering Failure Analysis 9, 2002, 227-233