Study of Failure Risk Factors for Residential Infrastructure Buildings
Main Article Content
Abstract
Purpose: The risks and uncertainties of construction projects have the potential to cause damage to construction projects. Risk analysis and management are the main features of construction project management to effectively deal with uncertainties and unexpected events to achieve project success.
Design/methodology/approach: Some pertinent risk variables for each classification are six internal, four project risk factors, and four external. Researchers detected 14 external risk factor reasons, 36 internal risk factor causes, 16 project factor causes, and 36 external risk factor causes.
Findings: Researchers suggest project risk management through this study by implementing overall risk management. A properly executed project plan and identified risks as early as possible at a later stage turn into success. Managing risks does not mean avoiding them but identifying them correctly to determine all associated opportunities and hazards for project success.
Research limitations/implications: A good risk management approach anticipates the risk of building failure. It can happen in residential infrastructure projects. The first step in risk management is to study the risk factors for the loss of residential infrastructure buildings. Following an analysis, the project manager generates recommendations or plans for risk reduction in response to the primary risks in infrastructure projects.
Originality/value: This paper is original
Paper type: Research paper
Downloads
Article Details
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
References
Asiyanto. 2008. Metode Konstruksi Proyek Jalan. Jakarta: Penerbit Universitas Indonesia.
AbdulHamid. 2015. Kegagalan Bangunan Pada Tanah Lunak di Kalimantan Barat. Jurnal Universitas Tanjung Pura
Khlaifat, D. M., Alyagoub, R. E., Sweis, R. J., & Sweis, G. J. 2019. Factors leading to construction projects' failure in Jordon. International Journal of Construction Management, 19(1), p.65-78.
Koestoer, R.H. 1995. Perspektif Lingkungan Desa Kota: Teori dan Kasus. Jakarta: Universitas Indonesia Press.
Kuswartojo, Tjuk, dkk. 1997, Perumahan dan Permukiman di Indonesia. Penerbit ITB, Bandung.
Nguyen, T. P., & Chileshe, N. 2015. Revisiting the construction project failure factors in Vietnam. Built Environment Project and Asset Management.
Saputra, Riki. 2015. Analisis Kegagalan Konstruksi dari Perspektif Socio Engineering System. Tesis Universitas Andalas.
Saputra, Riki. Akhmad Suraji & Abdul Hakam. 2016. Analisis Kegagalan Konstruksi dari Perspektif Socio-Engineering System. Jurnal Rekayasa Sipil. 12 (1): 59-67.
Sutjahjo, Kusuma D & Setiyadi. 2016. Aspek Hukum terhadap Kegaglan Pelaksanaan Pekerjaan Konstryksi Proyek di Jakarta. Jurnal Politeknik. 15 (1).
Wahyuningsih, Wahyu. 2020. Mitigasi Risiko pada Proyek Jasa Konstruksi, Studi Kasus: Proyek Jalan Tol Tebing Tinggi Parapat – Serbelawan Tahap 1 Zona 1A. Sekolah Pascasarjana, Universitas Sumatera Utara Medan.
Wiyana, Yustinus Eka. 2012. Analisis Kegagalan Konstruksi dan Bangunan dari Perspektif Faktor Teknis. Jurnal Wahana Teknik Sipil. 17 (2): 77-86.
Yushar. 2019. Tanggung Gugat Kontraktor dalam Kegagalan Bangunan. Jurnal Media Iuris. 2 (3): 407-426.
Zavadskas, Edmundas Kazimieras, Zenonas Turkis et al. 2008. Risk Assessment of Construction Projects. Journal of Civil Engineering and Management. Vol 16 (1): 33 – 46.
Zhi, H. (1995). Risk management for overseas construction projects. International journal of project management, 13(4), 231-237