Purpose: Parking is an essential need that the community has for a motorist. The density of parking lots is often a problem with parking needs in a place. Universitas Internasional Batam, one of the campuses in Batam City, has a relatively small parking area. Thus, this study aims to analyze the need for parking lots in the Universitas Internasional Batam environment.


Design/methodology/approach: The research method used is systematic observation guided by the Parking Space Unit (SRP) 1996. This research was carried out at night during the effective day of academic activity at Universitas Internasional Batam.


Findings: Based on the results of studies that have been carried out, it is concluded that the area of land to be carried out for car parking planning at Universitas Internasional Batam covers an area of 8,169.45 m2 and has met the needs. In addition, the land to be planned for motorcycles parking covering an area of 1,574.69 m2 has also met the needs.


Research limitations/implications: The planning and parking area at Universitas Internasional Batam have met vehicle parking needs.


Practical implications: Factors due to the density of parking lots at Universitas Internasional Batam cause many vehicles to park on the shoulder of the road (on-street).


Originality/value: This paper is an original work.


Paper type: Research papers.

Downloads

Download data is not yet available.

Article Details

Section
Articles

References

Adiputra, D. S., Rifai, A. I., & Bhakti, S. K. (2022). Design of Road Geometric with AutoCADĀ® 2D: A Case Wirosari-Ungaran Semarang, Indonesian. Citizen: Jurnal Ilmiah Multidisiplin Indonesia, 2(5), 729-738.
Almeida, P. R. L. de, Alves, J. H., Parpinelli, R. S., & Barddal, J. P. (2022). A systematic review on computer vision-based parking lot management applied on public datasets. Expert Systems with Applications, 198. https://doi.org/10.1016/j.eswa.2022.116731
Arifin, A., & Rifai, A. I. (2022). Geometric Design of Upper Cisokan Hydroelectric Power Plant Access Road with AutoCADĀ® Civil 3D (STA 3+ 000-STA. 4+ 800). Citizen: Jurnal Ilmiah Multidisiplin Indonesia, 2(5), 851-858
Asadulhaq, S. P., Rifai, A. I., & Handayani, S. (2022). Passenger Occupancy Phenomena of Trans Jakarta due to COVID-19: A Case Corridor X (2019-2021). Citizen: Jurnal Ilmiah Multidisiplin Indonesia, 2(5), 766-775.