ECONOMIC FEASIBILITY ANALYSIS OF THE CONSTRUCTION OF THE TANJUNG KRAMAT (HM. AGUS) ROAD SECTION OF EAST KUTAI DISTRICT

Main Article Content

Tukimun Tukimun
Robby Marzuki
Devita Rizky Anggraeny

Abstract

Road construction is very much needed in an effort to improve the regional economy, open access to the distribution of goods/services & people as well as in regional development efforts. This activity requires technical and economic planning to ensure that the activity is feasible to carry out. For this reason, it is necessary to conduct an analysis of the economic feasibility of constructing the Tanjung Keramat (HM. Agus) road in East Kutai Regency. This analysis uses the compound interest calculation method, Net Present Value (NPV) and Benefit Cost Ratio (BCR). The results obtained from the BOQ and RAB calculations showed that the total construction costs were Rp. 46,600,000,000.00. The results of the present value calculation over a 20 year life of construction costs + routine & periodic maintenance costs are Rp. 65,677,946,740.00. The results of calculating the benefits of Vehicle Operational Costs (BOK) for BENEFITS' current value are IDR 276,921,095,567.00. The results of the economic feasibility are declared "WORTH IT" to run because the results of the calculation of the NPV value are IDR 276,921,095,567.00 > than 1 and the BCR value is 4.22 > 1 NVP>1 so that the investment in road construction is a "WORTH IT" investment to carry out.

Downloads

Download data is not yet available.

Article Details

Section
Articles

References

Direktorat Jenderal Bina Marga. 2017. Manual Desain Perkerasan Jalan Nomor 04/SE.Db/2017. Jakarta
Departemen Pemukiman dan Prasaranan Wilayah, (2003). Perencanaan Perkerasan Jalan Beton Semen, PdT-14 2003, BSN. Jakarta.
Peraturan Pemerintah RI No.34, 2006. Tentang Jalan.
Sukirman, Silvia. 1988, Perkerasan Lenturan Jalan Raya. Penerbit Nova Bandung.
Hendarsin, Shirley L., 2000, Penuntun Praktis Perencanaan Teknis Jalan Raya Cetakan Pertama Penerbit Politeknik Negeri Bandung Jurusan Teknik Sipil. Bandung.
Clarkson H. Oglesby R. Garyy Hicks, Teknik Jalan Raya.
Tukimun, Eswan., 2017, Pengaruh Volume Lalu Lintas Terhadap Kinerja Ruas Jalan Pada Jalan Lambung Mangkurat, Kurva S: Jurnal Keilmuan dan Aplikasi Teknik Sipil 5 (2), 87-97.
Tukimun, Viva Oktaviani, A. Prawoto., 2024, Model Perbandingan Teknis dan Biaya Perkerasan Lentur dan Kaku pada Proyek Jalan di Kabupaten Kutai Timur, Jurnal Pendidikan Tambusai 8 (1), 3463-3474.
Tukimun., 2024, Analisa Pemilihan Rute Jalan Dengan Metode AHP (Studi Kasus: Ruas Jalan Cipta Graha–Kolek–Ronggang, Kutai Timur), Konsorsium UNTAG se-Indonesia 5 (1), 88-94.
YA Putra, Tukimun., 2019, Studi Analisa Tebal Perkerasan pada Halaman Parkir Fakultas Hukum dan Ekonomi Universitas 17 Agustus 1945 Samarinda, Kurva Mahasiswa 1 (1), 1132-1150.
S. adhan, Tukimun., 2017, Analisis Perkerasan Beton Semen pada Kawasan Industri Pelabuhan Internasional (Kipi) Maloy Kabupaten Kutai Timur, Kurva Mahasiswa 2 (2), 693-707.
RA Purnama,Tukimun., 2016, Analisis Investasi dan Kebutuhan Parkir Kendaraan pada Area Parkir di Bandara Sungai Siring di Kota Samarinda, Kurva Mahasiswa 1 (1), 36-50.