Study of The Impact of design on construction Project Delays
Abstract
Project delays are a problem that often occurs in various types of projects, especially construction projects, and have a significant impact on increasing costs, decreasing quality, and stakeholder dissatisfaction. One factor that often contributes to project delays is the design aspect, whether related to completeness, quality, or design changes during the implementation stage. This research aims to comprehensively examine the role of design in project delays based on findings in the scientific literature. The method used is a literature review by examining relevant national and international journal articles, published within the last ten years, and obtained through reputable scientific databases. The study process was carried out through the stages of identification, selection and literature analysis to group design factors that contributed to project delays. The results of the study show that project delays are largely influenced by design problems such as incomplete planning documents, design errors, weak design coordination between disciplines, and design changes that occur during the construction stage. These factors have implications for rework, work flow disruptions, and adjustments to project schedules. The conclusion of this research confirms that design has a strategic role in determining project time performance, so that improving the quality of the planning process and design coordination from the early stages of the project is key in minimizing the risk of delays.
Downloads
References
Arain, F. M., & Pheng, L. S. (2017). Critical factors affecting the success of construction projects in developing countries. Construction Management and Economics, 35(6), 375–394. https://doi.org/10.1080/01446193.2016.1230052
Doloi, H. (2016). Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. International Journal of Project Management, 34(3), 367–379. https://doi.org/10.1016/j.ijproman.2016.01.001
Enshassi, A., Mohamed, S., Abu Mustafa, Z., & Mayer, P. E. (2018). Factors affecting labour productivity in building projects in the Gaza Strip. Journal of Civil Engineering and Management, 24(5), 395–404. https://doi.org/10.3846/jcem.2018.6138
Gamil, Y., & Rahman, I. A. (2017). Identification of causes and effects of poor communication in construction industry: A theoretical review. Journal of Building Engineering, 12, 85–94. https://doi.org/10.1016/j.jobe.2017.04.002
Gündüz, M., & Almuajebh, M. (2020). Critical success factors for sustainable construction project management. Engineering, Construction and Architectural Management, 27(9), 2385–2405. https://doi.org/10.1108/ECAM-10-2018-0460
Hwang, B.-G., Zhao, X., & Ng, S. Y. (2016). Identifying the critical factors affecting schedule performance of public housing projects. Engineering, Construction and Architectural Management, 23(3), 279–295. https://doi.org/10.1108/ECAM-01-2015-0012
Ikhsan, I., Arifuddin, R., & Abdurrahman, M. A. (2025). Risk analysis of delay in construction project based on design and build contract. Construction Technologies and Architecture, 16, 45–54. https://doi.org/10.4028/p-GKP9mr
Khahro, S. H., Ali, T. H., & Memon, N. A. (2023). Key factors influencing delays in sustainable building construction projects. Sustainability, 15(7), 5872. https://doi.org/10.3390/su15075872
Marzouk, M., & El-Rasas, T. (2016). Analyzing delay causes in Egyptian construction projects. HBRC Journal, 12(3), 271–278. https://doi.org/10.1016/j.hbrcj.2014.03.003
Memon, A. H., Memon, A. Q., Khahro, S. H., & Javed, Y. (2023). Investigation of project delays: Towards a sustainable construction industry. Sustainability, 15(2), 1457. https://doi.org/10.3390/su15021457
Sambasivan, M., Deepak, T. J., Salim, A. N., & Ponniah, V. (2017). Analysis of delays in construction industry and mitigation measures. Built Environment Project and Asset Management, 7(2), 128–144. https://doi.org/10.1108/BEPAM-10-2016-0044
Sanni-Anibire, M. O., Mahmoud, A. S., & Hassanain, M. A. (2020). Causes of delay in construction projects in developing countries. Journal of Engineering, Design and Technology, 18(2), 263–281. https://doi.org/10.1108/JEDT-04-2019-0098
Shoar, S., & Chileshe, N. (2021). Exploring the causes of design changes in building construction projects: An interpretive structural modeling approach. Sustainability, 13(17), 9578. https://doi.org/10.3390/su13179578
Sweis, G., Sweis, R., Abu Hammad, A., & Shboul, A. (2019). Delays in construction projects: The case of Jordan. International Journal of Construction Management, 19(5), 375–384. https://doi.org/10.1080/15623599.2018.1484859
Vahedi Nikbakht, M., Gheibi, M., Montazeri, H., Yeganeh Khaksar, R., Moezzi, R., & Vadiee, A. (2024). Identification and ranking of factors affecting the delay risk of high-rise construction projects using AHP and VIKOR methods. Infrastructures, 9(2), 24. https://doi.org/10.3390/infrastructures9020024
Yap, J. B. H., Goay, P. L., Woon, Y. B., & Skitmore, M. (2021). Revisiting critical delay factors in building construction projects. Alexandria Engineering Journal, 60(1), 171–185. https://doi.org/10.1016/j.aej.2020.11.021
Yusoff, S. S. F. M., & Ismail, Z. (2024). Delays in interior design construction contract: A literature review. International Journal of Innovation and Industrial Revolution, 6(19). https://doi.org/10.35631/IJIREV.619003
Copyright (c) 2026 IJEBD (International Journal of Entrepreneurship and Business Development)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.